All Ongoing
All Completed
All Projects
Oil - Gas Pipelines
Tankage Works
Mechanical, Industrial
General Civil Works - Building Works
Power Generation
Road Construction
Water - Waste Water Pipelines
 
 
 
 
 
 
 
 
   
   PROJECT LISTING
 ALL COMPLETED PROJECTS
Type Country Client
Period Mths Year Start Date     
ONGOING PROJECTS   COMPLETED PROJECTS
 
TIKRIT - SAMARA OIL PIPELINE
Oil Planning & Construction Administration OPCA
     Iraq
1967 3 Mths 2
 
12" Dia Pipeline - 65km long. (Excluding supply of materials)
 
KIRKUK - BAGHDAD GAS PIPELINE
Ministry of Petroleum Directorate of Gas
     Iraq
1966 14 Mths 12
 
Construction of 300km of 8" dia and 300km of 16" pipeline. (Excluding the supply of materials)
 
SHAMES - ABU DHABI GAS PIPELINE
Ministry of Petroleum
     Abu Dhabi
1968 11 Mths 12
 
18" dia pipeline - 132km long. Included all testing and commissioning. (Excluding the supply of materials)
 
NGL COMPLEX PIPELINES
Ministry of Finance & Petroleum Affairs
     Qatar
1972 15 Mths 5
 
20" dia pipeline - 14 km long 12" dia pipeline - 150 km long 24" dia pipeline - 21 km long Included all testing & commissioning of the pipelines. (Excluding the supply of materials)
 
FAHAHEEL-RAS ABU FONTAS GASLINE DEVELOPMENT CONTRACT NO 3
Ministry of Finance & Petroleum Affairs
     Qatar
1974 30 Mths 16
 
95 km of 24"/30" dia gas pipelines and related station works. Included all testing and commissioning. (Excluding the supply of pipes and fittings)
 
MOMBASA - NAIROBI OIL PRODUCTS PIPELINE
Kenya Pipeline Company Limited
     Kenya
1967 13 Mths 23
 
14" dia pipeline - 425 km long. Included all testing and commissioning. (Excluding the supply of materials)
 
KHUFF GAS FIELD DEVELOPMENT SCHEME CONTRACT NO 5
Ministry of Finance & Petroleum Affairs
     Qatar
1976 21 Mths 25
 
110 kms of 30" / 16" dia gas pipelines and related station works. Including all testing and commissioning. (Excluding the supply of pipes and fittings)
 
KHUFF GAS FIELD DEVELOPMENT SCHEME CONTRACT NO 8
Ministry of Finance & Petroleum Affairs
     Qatar
1977 8 Mths 4
 
10 kms of 24" / 16" dia gas pipeline and related station works. Included all testing and commissioning. (Excluding the supply of pipes and fittings)
 
KHUFF GAS FIELD DEVELOPMENT SCHEME CONTRACT NO 8 - UMM SAID
Ministry of Finance & Petroleum Affairs
     Qatar
1980 2 Mths 0.5
 
Installation and testing of 16" / 24" gas pipelines. Including civil works and pumping stations. (Excluding the supply of pipe)
 
IRBID & AQABA WATER DIUSTRIBUTION & MAINLINE SYSTEM
Municipality of Irbid
     Jordan
1967 8 Mths 1.5
 
Construction comprised of welded pipelines of various diameters from 6" dia to 14" dia.
 
LOOP OIL PIPELINE CONNECTION
Qatar Petroleum Producing Agency
     Qatar
1980 2 Mths 4
 
Welding and connecting 16" dia loop oil pipeline to existing 20" dia line. (Excluding the supply of pipe and fittings)
 
DAR ES SALAAM PIPELINE
Tazama Pipeline Company Limited
     Tanzania
1980 12 Mths 5.5
 
Construction of 26 kms of 8" dia oil pipeline and all associated works including a pumping station in Dar Es Salaam. (Excluding supply of pipes and pumps.)
 
MESSLA OIL FIELD DEVELOPMENT PROJECT CONTRACT NO 3556-C-6
Arabian Gulf Exploration Company AGECO
     Libya
1980 14 Mths 85
 
Installation of 600 kms of 16" / 42" dia oil pipeline with pumping stations and private airport runway. (Excluding supply of line pipe, fittings and plant for stations.)
 
DUKHAN TO RAS ABU FONTAS PIPELINE
Qatar Genera;l Petroleum Company QGPC
     Qatar
1981 10 Mths 8
 
Construction of 65 kms of gas pipeline 30" dia and 24" dia from Dukhan Oil Field to the Ras Abu fontas Power Station. (Excluding the supply of line pipe and fittings)
 
MTWARA WHITE PRODUCTS PIPELINE
BP Tanzania Limited
     Tanzania
1983 6 Mths 0.5
 
Turnkey project including design, construction and commissioning. 10 kms of 8" dia products pipeline either replaced or renovated. Included all refurbishment and material supply.
 
PRODUCTS PIPELINE MOMBASA
Kenya Petroleum Refineries Limited
     Kenya
1985 3 Mths 0.25
 
Reallignment and burying of exposed product pipeline Mombasa, including all ancilliary works
 
WESTERN KENYA PIPELINE EXTENSION
NKK / Kenya Pipeline Company Limited
     Kenya
1991 24 Mths 30
 
Construction of 450 kms of products pipeline made up of welded 6" dia and 8" dia pipe. Extending existing pipeline (built by the Company) from Nairobi to Kenya's western borders with Uganda. Included Erection of product storage tanks totalling 152,000 cu.m erected at 4 terminal locations.
 
REHABILITATION OF TAZAMA PIPELINE
Tazama Pipelines Limited
     Tanzania
1991 54 Mths 6.02
 
Project comprised the repair and part replacement of existing 8" dia and 12" dia pipelines over a total length of 2479 kms.
 
PIPELINES & DEPOTS PROJECT - PHASE LLL CONTRACT 3
Nigerian National Petroleum Corporation NNPC
     Nigeria
1992 30 Mths 230
 
The project comprised the detailed design, engineering, procurement, construction and commissioning of 475 kms of 12" dia & 345 kms of 8" dia cross country pipelines, 12 kms of 16" dia river crossing pipeline ( completed by directional drilling ). Inclusive of all pumping facilities, instrumentation, civil works, mechanical & electrical works, telemetry facilities and the erection of all product storage tanks totalling 178,000 cu.m at to major depots. The project commenced in February '92 and was finally handed over at the end of the warranty period in October '95.
 
REPAIRS MOMBASA - NAIROBI PIPELINE
Kenya Pipeline Company Limited
     Kenya
1994 47 Mths 2.2
 
Major project in 7 phases for coating repairs and sleeves to existing 400mm dia pipeline over a ditance of 500 km between the port of Mombasa and Nairobi. Work entailed excavation and exposure of the full diameter of the pipe, repair to coating, welding of sleeves and backfill.
 
DISCHARGE PIPELINE REPLACEMENT
Kenya Petroleum Refineries Limited
     Kenya
1997 4 Mths 0.5
 
Replacement of 5.4 kms of 8" dia LPG tanker discharge pipeline inclusive of take-offs, valves and testing.
 
REPLACEMENT 30" DIA KHUFF GAS PIPELINE POINT K1 - N CONTRACT GTC/198/97
Qatar General Petroleum Company QGPC
     Qatar
1998 30 Mths 26
 
Work entailed the design, detailed engineering, procurement, installation of over 40 kms of 30" / 16" dia pipelines with fibre optic cabling connecting to various stations. Inclusive of all ancilliary works, instrumentation, telecommunications, testing and commissioning.
 
LAKE VICTORIA PIPELINE & PUMPING FACILITIES
Ashanti Goldmines Limited
     Kenya
1999 7 Mths 2.5
 
Design and construction of 26 kms of 350mm dia steel water pipeline on concrete supports from Lake Victoria to the goldmines. Project included a floating pontoon, pump station, generator yard and electrical power lines.
 
ZUARA WATER PIPELINE
Department of Military Construction
     Libya
1972 8 Mths 4
 
Construction of 120 kms of 12" dia ductile iron pipeline, including all related station works.
 
FUJEIRA WATER WORKS
Ministry of Water & Electricity
     United Arab Emirates
1976 6 Mths 2.25
 
Distribution network. (Excluding supply of materials)
 
MOMBASA COASTAL WATER SUPPLY PROJECT
Ministry of Water Development
     Kenya
1977 28 Mths 45
 
Construction of 182 kms of ductile iron pipeline 32" dia & 8" dia with miscellaneous buildings. Project included all testing and commissioning. (Incuding the supply of pipes & fittings)
 
EFFLUENT PIPELINE - QATAR
Ministry of Public Works
     Qatar
1980 2 Mths 2
 
Project for the construction of 35 kms of 30" dia welded steel effluent pipeline. (Excluding the supply of pipe)
 
AGUTHI WATER SUPPLY PROJECT
Ministry of Water Development
     Kenya
1980 17 Mths 4
 
Construction of water treatment works, 2 storage tanks, supply and installation of 62 kms of uPVC pipes of varying diameters forming mains distribution system.
 
LITEIN WATER SUPPLY PROJECT
Ministry of Water Development
     Kenya
1980 21 Mths 7
 
Construction of water treatment works including 8 storage tanks, pumpstation, buildings, supply & installation of 85 kms of uPVC pipe of varying diameters forming mains distribution system.
 
MOMBASA & COASTAL WATER SUPPLY PROJECT CONTRACT NO MCS 6 & MCS 12
Ministry of Water Development
     Kenya
1980 12 Mths 7
 
Distribution pipeline system for 152 kms of ductile iron pipeline and 110 mm / 225 mm dia uPVC mains distribution pipework. (Including the supply of pipes and fittings)
 
NDIA WATER SUPPLY PROJECT
Ministry of Water Development
     Kenya
1980 20 Mths 7.5
 
Construction of river intakes and treatment works including 8 No tanks, pump house, various buildings and 130 kms of ductile iron pipeline.
 
AJMAN WATER NETWORK
Ministry of Water & Electricity - Ajman
     United Arab Emirates
1981 12 Mths 2.6
 
Water distribution network for Ajman
 
WASTEWATER & IRRIGATION PIPELINES - JUBAIL CONTRACT NO 581-C-22
The Royal Commission for Jubail & Yambu
     Saudi Arabia
1981 24 Mths 31
 
Project included 22 kms of 40" dia asbestos cement waste water pipeline, 11 kms of 48" dia and 12 kms of 16" dia steel irrigation pipelines together with pumping stations & power and telecommunications ductbanks.
 
MARERE PIPELINE REHABILITATION
Ministry of Water Development
     Kenya
1979 9 Mths 1.5
 
Project comprised the rehabilitation of 400 mm dia water supply pipeline using ductile iron pipes. Works executed in difficult terrain in marsh and swamplands.
 
NYAKACH WATER SUPPLY PROJECT
Ministry of Water Development
     Kenya
1981 12 Mths 7.2
 
Intake treatment works including tanks, pumping stations, buildings, 6 reservoirs and 100 km of 400 mm and 50 mm dia uPVC pipelines.
 
CHANIA - KIMAKIA - THIKA WATER SUPPLY PROJECT CONTRACT NO C100
City Council of Nairobi
     Kenya
1981 12 Mths 25
 
Construction of 76 km of 56" dia / 30" dia steel pipeline and associated works. (Included the supply of all pipes and fittings)
 
WATER SUPPLY SYSTEM FOR WAAM & DHANHA (FUJAIRA)
Ministry of Electricity & Water Supply
     United Arab Emirates
1981 10 Mths 1
 
Supply and installation of 25 kms of ductile iron pipes of 100 mm dia & 300 mm dia with groundwater tank and a fully equipped pumping station.
 
WATER SUPPLY SYSTEM FOR RIYAMAH, JAREEF & TAWIYAN
Ministry of Electricity & Water
     United Arab Emirates
1981 12 Mths 0.75
 
Supply and installation of 100 mm dia and 200 mm dia pipes with groundwater tank and a fully equipped pumping station.
 
EFFLUENT DISTRIBUTION SYSTEM - CORNICHE & KHAN SECTIONS
Sharjah Municipality
     Sharjah
1983 9 Mths 5
 
Laying of 75 kms of asbestos cement pipes, 300 mm dia and 600 mm dia with 60 m long sea outfall pipe of 600 mm dia ductile iron pipe encased in concrete. (Excluding the supply of materials)
 
SHARJAH INTERNATIONAL AIRPORT FIRE MAIN REFURBISHMENT
Sharjah Airport
     Sharjah
1984 4 Mths 2
 
Laying of 3 kms of 200 mm dia ductile iron pipes with chambers and associated works. (Excluding the supply of materials)
 
MUUANDAR WELLFIELD TRUNK MAIN
Electricity & Water Department
     Sharjah
1984 5 Mths 4
 
Laying of 10 kms of asbestos cement pipeline 450 mm dia with borehole headworks and sub stations.
 
SHARJAH WATER SUPPLY PROJECT CONTRACT SWD.3 FALAJ - LAYYAH PIPELINE EXTENSION
Electricity & Water Department
     Sharjah
1985 6 Mths 2
 
Project comprised the design, construction and maintenance of a number of existing water distribution mains into a desalinated water delivery main, inclusive of storage tanks, piping and pumps. (Excluding the supply of materials)
 
TRUNK EFFLUENT PIPELINES CONTRACT - PHASE L
Sharjah Municipality
     Sharjah
1985 9 Mths 1.4
 
Project for the construction and maintenance of 3.2 kms of asbestos cement pipeline in the Khalid Lagoon area of Sharjah. The works included the supply and installation of all ductile iron pipe-work and fittings, sluice air valves etc., and the construction of various reinforced concrete chambers.
 
KAREN & LANGATA WATER DISTRIBUTION SYSTEM
Nairobi City Commission
     Kenya
1985 12 Mths 8
 
Project included 96 kms of 600mm to 150mm dia steel pipes, 42.5 kms of 100mm to 12 mm dia GMS pipes, 4 storage tanks, chambers and other asociated works.
 
KHOR FAKKAN SUPPLY - WADI WURRAYYAH WELLFIELD CONTRACT
Sharjah Municipality
     Sharjah
1985 10 Mths 4
 
Construction of 30 kms of ductile iron pipeline, chambers, 2 storage tanks, pumping station, ancilliary buildings, all mechanical & electrical works. (Excluding the supply of materials)
 
MALINDI WATER SUPPLY PROJECT
Ministry of Water Development
     Kenya
1986 11 Mths 11.25
 
The project comprised 50 kms of 600 mm dia steel and 40 kms of uPVC pipelines plus 6 main storage reservoirs.
 
THIRD NAIROBI WATER SUPPLY PROJECT SC204
Ministry of Water Developoment
     Kenya
1987 12 Mths 4.6
 
Project included the installation of 50 kms of water pipeline ranging from 300 mm dia and 400 mm dia complete with associated works. The project was executed in the urban areas of Nairobi.
 
REHABILITATION WORKS AT ISASHI WATER WORKS CONTRACT 12-2B
Lagos State Water Corporation
     Nigeria
1994 12 Mths 6.37
 
The project comprised the refurbishment of existing pumps & site facilities, the supply and installation of 2 new pumps, 8 pressure filters, chlorinating facilities, the erection of 4 new facility buildings and general landscaping of the area. The project included the procurement and installation of all required control systems, instrumentation and electrical works.
 
EL HERMEL / FAKIHA SEWAGE PROJECT
Ministry of Habitation & Co-Operation
     Lebanon
1994 14 Mths 0.5
 
General refurbishment works.
 
REHABILITATION OF IJU WATER WORKS
Lagos State Water Corporation
     Nigeria
1995 24 Mths 16.1
 
The project comprised the design and refurbishment of the entire existing waterworks filtration system, pumping system, sedimentation tanks, chlorinating facilities, ductile iron water mains pipeline and complete electrical, civil and building works.
 
AL MINA GARDENS INFRASTRUCTURE - PHASE L TRIPOLI
Council for Major Projects
     Lebanon
1996 24 Mths 20
 
Works entailed new services to a residential development site. The project included all roads, surface water drainage, water distribution lines, sewage mains with sea outfall, pumping stations and electrical distribution.
 
DOHA - ARAMOUN INFRASTRUCTURE WORKS
CDR
     Lebanon
1996 30 Mths 17.9
 
The project comprised 27 kms of roads & stormwater drainage, drilling and equiping 6 no wells, chlorination building & pump house, 3 no reservoirs, 39.2 kms of ductile iron water pipelines, 25 kms of sewage pipelines. The rehabilitation of electrical and telecommunication networks were also carried out as part of the project. (US$ 10.71 million of the US$17.90 million project value relates to water & waste water networks and the related structures)
 
EIN EL RUMANEH / FURN EL SHIBBACK INFRASTRUCTURE WORKS
CDR
     Lebanon
1996 24 Mths 10
 
The project comprised 11 kms of roadworks & stormwater drainage, 13 kms of ductile iron water supply network and 2.4 kms of reinforced concrete box culverts, 11.5 km of sewer pipeline network and 11 kms of electrical & telephone networks including street lighting.
 
BAALBECK - NABI CHIT WATER SUPPLY & WASTEWATER SYSTEM PROJECT
CDR
     Lebanon
1997 22 Mths 29
 
The project included drilling, fitting & commissioning of 22 No boreholes. The rehabilitation and construction of 16 No reservoirs ranging from 25 cu.m to 6000 cu.m, the construction of 4 No elevated tanks, 4 No chlorination facilities, rehabilitation of 4 No spring sites. Pipe works included 181 kms of ductile iron pipes ranging from 80 mm dia up to 250 mm dia, 23 kms of asbestos cement & glass reinforced plastic sewer pipes ranging from 150mm dia upto 600 mm dia. All works included procurement, construction, testing & commissioning.
 
NAIROBI WATER SUPPLY PROJECT
Nairobi City Commission
     Kenya
1997 15 Mths 2.5
 
Project for 32 kms of water distribution and infill mains, comprising 600 mm dia to 700 mm dia steel pipe and 80 mm dia to 100 mm dia galvanised steel pipes. The project incluuded river crossings and all associated works.
 
AVIATION FUEL SYSTEM
Directorate of Roads & Bridges
     Iraq
1965 9 Mths 2.5
 
Supply & installation of filters, storage tanks, piping works & hydrants. The project included all testing & commissioning.
 
DAURA GREASE PLANT
Ministry of Oil Planning & Construction Administration
     Iraq
1966 11 Mths 1.2
 
The project included all erection & testing for the 4000 ton capacity plant. (Excluding the supply of materials)
 
OIL STORAGE TANKS DAWRA, MOSUL & DIWANIYAH
Ministry of Oil Planning & Construction Administration
     Iraq
1966 12 Mths 3.4
 
The project comprised the erection of 82 No tanks including painting and civil works. The capacities if the tanks ranged from 200 cu.m up to 3000 cu.m capacity. (Excluding the supply of materials)
 
PETROL PUMP STATION - DOHA
Jaidah Motors & Trading Company
     Qatar
1967 6 Mths 1
 
Project included all civil works, piping works & supply of pumps.
 
RAYON PLANT - MUSSAYEB
Ministry of Industry
     Iraq
1967 8 Mths 1.5
 
Project included all mechanical installation and structural steel works including testing. (Excluding the supply of materials)
 
COLOMBO REFINERY TANK FARM
Ministry of Oil Colombo Refinery
     Sri Lanka
1967 12 Mths 2.4
 
Project comprised 54 No storage tanks with various capacities ranging from 1,000 cu.m to 52,000 cu.m. The work included, erection, painting, piping works, all testing and commisioning. (Excluding supply of materials)
 
OIL STORAGE TANKS - KUWAIT
American Independent Oil Company
     Kuwait
1968 6 Mths 1.2
 
Project comprised the design, procurement and construction of 2 No tanks for AMIN Oil.
 
DESULPHURISATION & DEHYDRATION PLANTS - SHAMES GAS PROJECT
Ministry of Directorate of Gas Distribution Abu Dhabi
     Abu Dhabi
1968 18 Mths 2.5
 
Project included installation of equipment, erection of storage tanks, piping works and associated civil engineering works. (Excluding the supply of materials)
 
FREEPORT REFINERYTANK FARM
Borco Refinery
     The Bahamas
1969 8 Mths 1.2
 
The project for the erection of various storage tanks ranging from a capacity of 10,000 cu.m to 45,000 cu.m. (Excluding the supply of materials)
 
GULF REFINERY TANK FARM
Gulf Refinery Bertonico
     Italy
1970 6 Mths 1
 
The project for the erection of storage tanks with capacities ranging from 500 cu.m to 5,000 cu.m. (Excluding supply of materials)
 
MEDITTERRANEAN REFINERY
Mediteranean Refinery - Milan
     Italy
1970 8 Mths 1
 
Project for erection of storage tanks with spheres, capacity 30,000 cu.m. (Excluding the supply of materials)
 
FLOATING ROOF STORAGE TANKS
Snam Progetti Sinatzaro
     Italy
1971 12 Mths 1.5
 
Project for the erection of 3 No floating roof storage tanks, each with a capacity of 112,000 cu.m. The works included all welding and hydraulic testing. (Excluding the supply of materials)
 
STORAGE TANKS BERLONI - PESARIO
C.I.I.P
     Italy
1971 6 Mths 0.8
 
Project for the erection of storage tanks (2500 tons of steel) capacities ranging from 2,500 cu.m to 20,000 cu.m. (Excluding the supply of materials)
 
ZAWIYA REFINERY STORAGE TANKS
Snam Progetti - National Oil Cooperative - Tripoli
     Libya
1971 18 Mths 2.6
 
Erection and testing of 55 No tanks ranging in capacity from 500 cu.m to 45,000 cu.m including the erection of 2 spheres, both with a capacity of 250 cu.m. A total of 11,200 tons of steel. (Excluding the supply of materials)
 
ELEVATED WATER TANKS
Directorate of Military Construction - Tripoli
     Libya
1973 8 Mths 1.4
 
Supply and erection of elevated water storage tanks, including all civil works and piping connections.
 
NGL PLANT UMM SAID
Davy Powergas Limited - Ministry of Petroleum
     Qatar
1973 6 Mths 1
 
General pipework installation in NGL plant.
 
ELEVATED WATER TANKS - TRIPOLI
Directorate of Military Construction
     Libya
1974 12 Mths 3.6
 
Design, supply & erection of 12 No elevated water tanks, 13 No steel sheds each 12.00m x 30.00m and 3 No steel sheds each 60.00m x 100.00m
 
HOMS REFINERY EXTENSION CONTRACT NO 4
Homs Refinery
     Syria
1974 11 Mths 2.2
 
Mechanical erection including piping works and testing, together with the supply, design and erection of storage tanks, capacity ranging from 500 cu.m to 20,000 cu.m. (Including the supply of tank materials only).
 
DAR ES SALAAM OIL DEPOT
Tazama Refinery
     Tanzania
1974 9 Mths 1.4
 
Erection of 3 No tanks in refinery. (Excluding the supply of materials)
 
OIL DEPOT - TARTOUS
Syrian Company for Oil Transport (SCOTRA)
     Syria
1975 12 Mths 3.2
 
Turnkey project, including supply and erection of 3 No storage tanks each with a capacity of 40,000 cu.m., together with construction of piping connections related to drainage & other facilities. Project included all testing. (Excluding the supply of pipes).
 
BANIAS REFINERY OIL STORAGE TANKS
Banias Refinery
     Syria
1976 12 Mths 3.2
 
Project comprised the erection, painting, all testing & commisioning of tanks ranging in capacity from 10,000 cu.m to 20,000 cu.m. (Excluded the supply of materials).
 
HADITHIA OIL STORAGE TANKS
State Consulting Oil Products (SCOP)
     Iraq
1976 12 Mths 2.4
 
Supply, design, erection, painting, testing & commissioning. Total capacity 30,000 cu.m.
 
KHUFF GAS FIELD DEVELOPMENT CONTRACT NO 6
Ministry of Finance & Petroleum Affairs
     Qatar
1976 15 Mths 4
 
Project comprised the erection, painting, testing & commissioning of well-head treatment plants. The project also included the laying of 10 kms of 6" dia. flow lines. (Excluding all civil works and supply of consumeables.)
 
DUKHAN - DOHA - UMM SAID GAS PIPE CLEANING
Department of Petroleum Affairs
     Qatar
1978 6 Mths 2.4
 
Complete cleaning & testing of gas pipeline.
 
PIPELINES DUKHAN
Qatar Petroleum Producing Agency
     Qatar
1979 8 Mths 2.4
 
Project for installation & testing of 6" dia. flowlines. Including manifold & wellhead connections.
 
MODERNISATION CRUDE OIL PUMPING STATION - DAR ES SALAAM
Tazama Pipeline Company Limited
     Tanzania
1980 12 Mths 4
 
Project for the transfer, construction and total modernisation of a crude oil pumping station. (Project included civil works & supply of materials.)
 
WATER TANKS & PIPELINES
Ministry of Agriculture & Fisheries
     Sharjah
1982 3 Mths 0.2
 
Project for the construction of a 250 cu.m reinforced concrete water tank & 3 kms. of 150 mm dia. asbestos cement pipes with associated well connections.
 
PUMPS - KALBA
Ministry of Electricity & Water
     Sharjah
1982 4 Mths 0.2
 
Supply & installation of submersible pumps.
 
OIL TANK REFURBISHMENT - NAIROBI
Kenya Pipeline Company Limited
     Kenya
1983 23 Mths 4
 
Project for the repair and rennovation of 2 No fire damaged oil tanks. Improvement works to the tank farm including, general rebuilding works and upgrading of firefighting facilities, complete with electrical & instrumentation works.
 
MOMBASA PETROLEUM STORAGE FACILITIES
Lavalin (Canada) - Ministry of Energy
     Kenya
1984 26 Mths 14.3
 
Project comprised the erection of 3 No 330,000 bbl and 2 No 250,000 bbl storage tanks. All complete with installation of piping & fittings, electrical & installation works, structural steelwork, painting. Testing & commission was carried out as part of the project. (Excluding the supply of materials.)
 
AIRPORT FUEL DISTRIBUTION SYSTEM - DAR ES SALAAM
British Petroleum
     Tanzania
1984 6 Mths 0.6
 
Installation of fuel hydrant - distribution system for airport at Dar Es Salaam. The project comprised the mechanical installation of all hydrants, manifold piping & plant. Additionally all associated civil works, cathodic protection, electrical & instrumentation works were included in the project. (Excluded the supply of materials)
 
TELEPHONE SYSTEM - BEIRUT
Ministry of Post & Telegraph
     Lebanon
1983 12 Mths 10
 
Rehabilitation of the telephone system of Beirut in conjunction with ITT from the USA.
 
UNITED STATES NAVY AIRFIELD - MOMBASA DEPOT
US Navy
     Kenya
1982 15 Mths 0.6
 
Construction of all facilities including offices, helicopter pad, and associated works.
 
ELEVATED STEEL WATER TANK
Sharjah Water Department
     Sharjah
1984 2 Mths 0.1
 
Project for the construction of an elevated steel water tank 40 ft high with capacity of 10,000 gallons.
 
NAIROBI TERMINAL ADDITIONAL WORKS CONTRACT
Kenya Pipeline Company Limited
     Kenya
1984 12 Mths 0.6
 
Project comprised the upgrading of 4 No tanks to provide safer fire fighting standards and the construction of a new fire water storage tank.
 
KARASINI OIL JETTY REHABILITATION
Norwegian Agency for International Development (NORAD) (s/c to A/S Noremco Construction)
     Tanzania
1986 9 Mths 1.2
 
General repairs, replacement & refurbishment of product pipelines on existing loading jetty, including all electrical, instrumentation & painting works.
 
MOMBASA REFINERY REHABILITATION WORKS
Kenya Petroleum Refinery
     Kenya
1998 18 Mths 1.1
 
Project comprised repairs to storage tanks, shutdown works & general maintenance works.
 
VEGETABLE OIL & TALLOW STORAGE TANKS - DAR ES SALAAM
Tazama Pipeline Company Limited
     Tanzania
1988 12 Mths 1.2
 
Project comprised design, supply and erection of 4 No 1,250 cu.m cone-roof tanks, 1 km of steel pipe up to 8" dia., foundations, supply & erection of boiler and boiler house, painting, all electrical, instrumentation & cathodic protection works.
 
KIPEVU WHITE OILS IMPORT / EXPORT FACILITY
Kenya Pipeline Company Limited
     Kenya
1989 21 Mths 4.2
 
The project situated at the Mombasa Oil Terminal Jetty comprised the provision of a complete mechanical process system for jetty, including loading arms & manifold pipework, valves and pipework of 12" & 16" dia from jetty to existing tank farm. Complete mechanical systems for 2 No. pumping stations, epoxy lining of existing kerosene storage tank, reinforced concrete walled area & foundation for equipment, complete electrical system installation and field instrumentation, testing and commissioning of the works.
 
REPAIR / UPGRADE TANKS DAR ES SALAAM
Tazama Pipeline Company Limited
     Tanzania
1991 68 Mths 6.25
 
The project comprised works on 6 No storage tanks each with an approximate capacity of 40,000 cu.m. The works entailed the installation of a new fire fighting system, tank heaters, underground piping and drainage system, supply and erection of steel replacement tanks, replacement of damaged tank plates, roof components & fittings, sealing of existing structures. Project was delayed due to operational requirementsby the Employer and due to the addition to the contract of additional works. Project financed by EIB
 
MOMBASA KPRL SHUTDOWN MAINTENANCE PROGRAM
Kenya Petroleum Refineries
     Kenya
1991 5 Mths 1.8
 
Project for the replacement of supporting beams of structures in Oil Refinery.
 
ADDITIONAL HEAD RECOVERY PROJECT
Kenya Petroleum Refineries
     Kenya
1991 6 Mths 1
 
Project for the construction of piled foundations including the installation of equipment, all ancilliary works, instrumentation & electrical works.
 
FURNACE REPAIRS
Kenya Petroleum Refineries
     Kenya
1991 4 Mths 0.35
 
Project for repairs to Main Crude Furnace, radiant & convection sections, including interconnecting ducting and renewal of radiant coils in the main furnace.
 
MAINTENANCE TEL UNIT
Kenya Petroleum Refineries
     Kenya
1991 4 Mths 0.22
 
Project to clean, maintain & paint the whole TEL Unit ensuring the safe operation & reliability of the unit.
 
TANK - TPDC
Tanzania Petroleum Development Corporation
     Tanzania
1991 12 Mths 3
 
Project for the construction of a new steel storage tank, capacity of 45,000 cu.m with floating roof, including all civil works, supply, erection, painting, testing & commissioning. The tie in to existing system was also included in the project.
 
TIPER TANK S6 REHABILITATION CONTRACT
Tanzanian & Italian Petroleum Refinery Company Limited
     Tanzania
1991 10 Mths 0.56
 
The scope of the project included supply, rehabilitation works & commissioning of a 45,000 cu.m crude oil storage tank.
 
PIPELINE & DEPOTS PROJECT - PHASE LLL CONTRACT 3 (DEPOTS)
National Nigerian Petroleum Corporation (NNPC)
     Nigeria
1992 30 Mths 16
 
Project for two major depots comprising 31 No steel storage tanks with an overall capacity of 178,000 cu.m. including design, procurement and construction for tanks and related facilities. This was a section of a major project executed by the group totalling US$ 233 million, listed under pipelines in this listing.
 
JIEH STORAGE TANK CONTRACT
Electricite du Liban
     Lebanon
1993 27 Mths 0.8
 
The project comprised the construction & erection of a 25,000 cu.m oil storage tank complete with all related civil works. The work were supervised by Electricite de France.
 
REHABILITATION OF TANK 102 - MOMBASA
Kenya Petroleum Refinery
     Kenya
1995 10 Mths 0.25
 
The work to a 45 m dia. tank consisted of the renewal of floating roof deck plates, bottom plates & external painting of the floating roof plates.
 
KIPEVU STORAGE FACILITY
Kenya Pipeline Company
     Kenya
1995 8 Mths 0.5
 
Repairs to fire hydrant system, repairing or replacing corroded elements of storage tanks and pipelines.
 
REPAIRS TO FUEL STORAGE TANK 1906
Kenya Pipeline Company
     Kenya
1996 6 Mths 0.65
 
The project for repairs to a 40,000 cu.m storage tank included draining, cleaning, gas freeing, painting, replacement of pipes, fittings & roof seals.
 
REFURBISHMENT OF TANKS - SHELL
Kenya Shell Limited
     Kenya
1996 6 Mths 0.15
 
The project comprised the re-roofing of 2 No fuel storage tanks, one of 2,500 cu.m capacity, the other 1,300 cu.m capacity and the replacement of bottom plates in 1 No tank of 5,300 cu.m capacity.
 
DOHA - ARAMOUN INFRASTRUCTURE WORKS
CDR
     Lebanon
1993 30 Mths 3.23
 
Project for rehabilitation of electrical & telecommunications networks. Carried out as part of a major project totalling $US 17.9 million and listed under water related projects in this listing.
 
REPAIRS FUEL STORAGE TANK TK1902
Kenya Petroleum Refineries Limited
     Kenya
1997 12 Mths 1
 
General repairs to a 52,500 cu.m fuel storage tank.
 
REHABILITATION OF ABAJI PUMPSTATION
Nigerian National Petroleum Corporation (NNPC)
     Nigeria
2000 26 Mths 12
 
The complete installation of main line pumps, drivers, compressors and blowers. In addition the project included the supply and installation of new fire water pumps, a water storage tank & other ancilliaries related to the fire fighting system, all infrastructure facilities and testing & commissioning of all pump station systems.
 
LPG STORAGE & FILLING PLANT
Groupe Snig (Tanzania) Limited - Tanzania Oil Terminal Company
     Tanzania
2000 3 Mths 0.29
 
The project comprised all mechanical works for a 2000 cu.m Ca. LPG Sphere, 800 cu.m Ca. water tank, filling plant, fire fighting pumps, compressor, LPG pipework, fire protection pipework and connection pipework from loading manifold to plant. In addition to the project period of 3 months additional time was given to resolve details with Client.
 
REFURBISHMENT TANKS PROJECT
Kenya Pipeline Company
     Kenya
2003 8 Mths 2
 
The project comprised the refurbishment of 2 No floating roof tanks with capacities of 52,500 cu.m and 39,500 cu.m. Works included repairing & painting of roof sides & soffits, top deck of floating pontoon roof & shell plates (both internally and externally), the installation of new rim seals and replacement of nitrogen foam spraying pipeline.
 
TANK ERECTION PROJECT
Watsila NSD EA
     Kenya
2000 6 Mths 0.5
 
Project for the erection of 7 No fuel & water storage tanks ranging in capacity from 100 cu.m to 7,000 cu.m.
 
VIHARI HOUSING SCHEME
Vihari Housing Department
     Pakistan
1962 24 Mths 2.5
 
The project, situated in the Indus Basin, comprised the construction of two housing colonies with a total of 400 homes.
 
KATCHAKU & MANDHI BAHAUDDINE HOUSING SCHEME
Katchaku & Mandhi Housing Department
     Pakistan
1963 24 Mths 1.8
 
Project for 500 housing units.
 
SOCIAL SECURITY BUILDING BAGHDAD
Directorate of Social Security
     Iraq
1967 30 Mths 2.6
 
The project for an office building with area of 29,500 sq.m, the location in central Bagdad in a built up area. Works were staggered over 30 months to suit the client.
 
DIDDEH RESIDENTIAL SCHEME
Zakhem Real Estate
     Lebanon
1972 12 Mths 1
 
Project comprised 10 No appartment buildings and included all works.
 
GAS STATIONS - QATAR
Ministry of Petroleum
     Qatar
1973 30 Mths 2.8
 
Project comprised the civil works for the construction of all required foundations for 10 No gaseline stations. Works were staggered over 30 months to suit the Clients requirements.
 
PREFABRICATED HOUSING FACTORY - TRIPOLI
Ministry of Housing
     Libya
1974 12 Mths 2.5
 
The project for all civil works, mechanical erection and installation of utilities (both electrical and water) for a prefabricted housing factory complex included sheds, factory and administration building. (Excluding the supply of materials.)
 
AJMAN ARAB BANK TOWER BUILDING
Arab Bank - Ajman
     United Arab Emirates
1976 15 Mths 1
 
Project for the construction of a multi storey office building including all works.
 
VILLA CONSTRUCTION
Sheik Ali Salim
     United Arab Emirates
1976 18 Mths 1.6
 
Project for the complete construction of 10 No luxury villas.
 
POULTRY FARMS
Unifood - Sharjah
     United Arab Emirates
1976 8 Mths 0.65
 
Construction of poultry farms.
 
WAREHOUSE & SHOWROOMS
Harrisons - Dubai
     United Arab Emirates
1976 8 Mths 0.5
 
Project for the complete construction of a warehouse & showroom.
 
ALI BIN TALIB SCHOOL - SHARJAH
Government of Sharjah
     United Arab Emirates
1977 6 Mths 0.53
 
Construction of school building complete with all associated works.
 
JAIDAH TOWER DEVELOPMENT
Jaidah Motors & Trading Company
     Qatar
1977 24 Mths 8
 
The project for the complete construction of a twin tower, 15 storey office building complete with central air conditioning and including all electrical / mechanical works.
 
WATER SUPPLY STORAGE TANK - SHARJAH
Government of Sharjah
     United Arab Emirates
1978 8 Mths 0.2
 
Complete construction of water storage tank.
 
MEDICAL STAFF ACCOMODATION FOR HAMAD GENERAL HOSPITAL
Ministry of Health
     Qatar
1980 24 Mths 20
 
Project for the construction of accomodation units to house hospital staff.
 
OAK CENTER OFFICE PARK
Cedarland Development Company
     United States of America
1980 12 Mths 4.7
 
General office park development containing office units and including intallation of all utilities.
 
ENDELL STREET HOSTEL
Wiseprest Limited
     England
1980 10 Mths 1.4
 
Refurbishment of 167 bed youth hospital in London. Works included the basement, kitchen & dining areas, the wardens flat and the ground floor reception area.
 
NEW HEADQUARTERS - QATAR INSURANCE COMPANY
Qatar Insurance Company
     Qatar
1980 18 Mths 6.5
 
Project for the complete construction of office building.
 
RECREATIONAL FACILITIES - DUKHAN
Qatar General Petroleum Company
     Qatar
1980 12 Mths 2
 
Project comprised the construction of cinema and sports facilities.
 
NEW WOMENS HOSPITAL - HAMAD GENERAL HOSPITAL - PHASE L
Ministry of Public Works
     Qatar
1981 4 Mths 0.9
 
Project for all groundworks and foundations related to the new facilities.
 
CHARTERED BANK - DOHA
Chartered Bank
     Qatar
1981 15 Mths 10
 
Project for the complete contruction of a ultra modern head office building.
 
RECREATIONAL FACILITIES MADHAB FALEJ & FUJAIRA
Ministry of Agriculture & Fisheries
     United Arab Emirates
1982 10 Mths 1.5
 
The project comprised the complete landscaping and irrigation wporks for the area and included two swimming pools, two saunas, a childrens park and general development of the Falej area. In addition the project included the drilling of two water wells, the supply & installation of submersible pumps in the wells, the construction of a 250 cu.m reinforced concrete water tank and connection pipework from the well to storage tank.
 
INTERCONTINENTAL HOTEL - MOMBASA
Equatorial Beach Properties Limited
     Kenya
1984 22 Mths 17
 
Management Contractor for the contruction and complete fitting out of a 200 room, 5 star hotel with all retaurants, public facilities, health club & gambling casino.
 
RESIDENTIAL CONDOMINIUM - ARLINGTON - TEXAS
Cedarland Development Company
     United States of America
1983 24 Mths 15
 
The project comprised the construction of residential condiminiums, a shopping centre and commercial buildings.
 
OFFICE BUILDING - OLD BROMPTON ROAD
Zakhem Properties Limited
     England
1983 24 Mths 4
 
The project for the complete construction of a modern mixed function, office - residential building in south west London. The building included office space on ground and lower ground floor, 24 residential appartments on the 1st to 5th floor. Also underground parking for 27 vehicles was provided.
 
ZAKHEM PLAZA - BEIRUT
Zakhem Engineers SAL
     Lebanon
1983 24 Mths 10
 
Project for the complete construction of an ultra modern, multi storey office tower complete with ground level shopping arcade and underground, basement car parking.
 
LAMBOURNE AVENUE HOUSING COMPLEX - WIMBLEDON
Zakhem Properties Limited
     England
1984 15 Mths 3.2
 
The project comprised the construction of 6 No luxurious, large detached houses each with an area of 3,500 sq.ft., including complete infrastructure/services, landscaping and all associated structures.
 
ELISA COURT DEVELOPMENT - LONDON
Zakhem Properties Limited
     England
1984 18 Mths 2.6
 
The project situated in Chitty Street, Central London for the construction of a totally new building spanning Charlotte Mews and comprised basement offices, ground floor showrooms and 16 No luxury flats on the 1st to 4th floors.
 
COPSE HILL HOUSING - WIMBLEDON
Zakhem Properties Limited
     England
1985 14 Mths 3
 
The project situated in the Wimbledon area of London comprised the construction of 5 No 2,500 sq.ft secluded, luxury terraced houses each with an integral garage and on an adjacent site the two large luxury detached houses with separate detached double garages. The works included all services and infrastructure works.
 
REINSTATEMENT WORKS TO PIPELINE RIGHT OF WAY
Kenya Pipeline Company
     Kenya
1985 6 Mths 0.5
 
General reinstatement works to the Mombasa - Nairobi Oil Pipeline right of way.
 
KENYA RAILWAY TELECOMMUNICATIONS PROJECT PHASE LL
Kenya Railways / Phillips GmBH
     Kenya
1985 14 Mths 1.45
 
Civil works project comprising trenching and laying telecommunications cables along the Mombasa to Nairobi railway line. A total of 525 kms.
 
UMOJA PHASE LL PROJECT - HOUSING SCHEME CIVIL WORKS.
Ministry of Housing
     Nigeria
1985 6 Mths 0.5
 
Earth works for housing project, heavy excavation of black cotton soil & rock
 
MALABA STATION DEPOT - PHASE L
Kenya Railways
     Kenya
1985 12 Mths 2.5
 
Project comprised the construction of all buildings, roads, carpark, sewage system and all other associated civils works.
 
FRESH WATER TANK - KIGAMBONI
Tazama Pipeline Company Limited
     Tanzania
1985 6 Mths 0.4
 
Construction of a fresh water, reinforced concrete, storage tank including all piping installation and pump house.
 
KIPEVU POWER STATION
Kenya Power Company
     Kenya
1986 12 Mths 0.4
 
Project for all the civils works relating to the substructures of the power station.
 
RECREATION CENTER
Britih Petroleum
     Tanzania
1985 6 Mths 0.6
 
Project for the complete construction of a recreation centre including club house, cafeteri and other amenities. The pproject included all external work and landscaping.
 
FOREST PARK DEVELOPMENT - ALGARVE
Quinta da Colina Sociedade Urban Izadora LDA
     Portugal
1985 36 Mths 18
 
This was a prestigious design and construct project comprising the development of over 300 acres into residential, commercial & leasure facilities. The project included an 18 hole championhip level golf course and all infrastructure works. Over 100 luxury villas, tourist houses, a clubhouse and swimming pools were constructed under Phase l of this project.
 
BUILDING - EARLS COURT ROAD - LONDON
Palmcourt Limited
     England
1986 6 Mths 0.77
 
The project for the construction of a reinforced concrete framed building in Earls Court Road and included residential and commercial development on three floors with basement and ground floor office facilities.
 
REFURBISHMENT OXFORD STREET / COPTIC STREET - LONDON
Palmcourt Limited
     England
1987 10 Mths 1.2
 
Refurbishment of two existing buildings forming an "L" shaped site into luxury flats on three floors with retail / commercial units at ground floor & basement levels.
 
QUEENS GATE MEWS - LONDON
Zakhem Properties Limited
     England
1988 4 Mths 0.25
 
Total refurbishment of existing house into a three bedroom luxury mews house with integral garage.
 
COPTHORNE HOTEL - SLOUGH
Copthorne Hotels (Slough) Limited
     England
1989 17 Mths 31
 
Construction of a 219 room, 9 storey hotel with conference facilities including two levels of underground parking for up to 300 cars. The project was completed in just over 17 months using the "Tunnel Form" method of contruction for the main reinforced concrete frame. Prefabricated bathroom pods were utilised throughout. Included in the project was the complete fitting out of the hotel which incorporated the latest technology in M & E control systems and computer based operational facilities and environment control.
 
HARCOURT STREET LONDON
Zakhem Properties Limited
     England
1991 5 Mths 0.28
 
Extensin and refurbishment of existing "Listed Buildng" into residential units with retail / commercial units at ground and basement levels.
 
QUEENSGATE MEWS - LONDON
Sunford Corporation
     England
1991 3 Mths 0.55
 
Erection of shell unit for new residential building.
 
RUA CARDEAL MERCIER DEVELOPMENT - LISBON
London & Lisbon Holdings
     Portugal
1991 12 Mths 3.2
 
Construction of new mixed residential / commercial development comprising a reinforced concrete framed structure providing 16 luxury appartments, office units at ground floor level & two levels of underground car parking.
 
BEIRUT UNIVERSITY COLLEGE - BYBLOS
Beirut University College
     Lebanon
1991 20 Mths 5
 
The project comprised the construction of a new general administration building and infrastructure works for the new University complex at Byblos
 
BEIRUT UNIVERSITY COLLEGE - BYBLOS - PHASE LL
Beirut University College
     Lebanon
1993 22 Mths 3.5
 
Project for the construction of new Architecture & Engineering inclusive of all related infrastructure works.
 
REFURBISHMENT OF RIVIERA HOTEL - BEIRUT
Riviera Hotel Limited
     Lebanon
1992 15 Mths 4.7
 
The project for the complete refurbishment of a 125 bedroom hotel with conference facilities and reception areas, providing air conditioning throughout.
 
REFURBISHMENT RIVIERA HOTEL - BEIRUT - PHASE LL
Riviera Hotel Limited
     Lebanon
1994 9 Mths 2.4
 
Project for the extension and refurbishment of the hotel leisure center including the complete modernisation of the swimming pool located on sea front.
 
PALACE GATE RESTAURENT COMPLEX
Catering & Restaurents Limited
     England
1995 3 Mths 0.85
 
The refurbishment and conversion of property into first class, fully air conditioned restaurent.
 
CASERNE ARMY CAMP
Ministry of Defence
     Lebanon
1995 15 Mths 1.5
 
The project comprised the complete rhabilitation of the Caserne Army Camp at Abou Sleiman - Ablah
 
23-24 KENSINGTON GORE - LONDON
Wildlink Limited
     England
1996 24 Mths 6
 
The project included the demolition of two existing houses and the construction of a reinforced concrete framed structure providing five luxury appartments over 6 levels, with basement carparking. The finishing works were to an extremely high standard and the building was fully airconditioned throughout.
 
UNIVERSITY - INN HOTEL
New Byblos City Inc
     Lebanon
1995 26 Mths 17
 
Construction of 200 room, 4 star hotel.
 
ROMANIAN EMBASSY - BEIRUT
Romanian Embassy
     Lebanon
1996 24 Mths 1.1
 
Complete rehabilitation of embassy building.
 
ST GEORGES HOSPITAL EXTENSION - BEIRUT
St Georges Hospital
     Lebanon
1997 18 Mths 3
 
The project for the construction of 35,000 sq.m., multi storey reinforced concrete framed structure providing, 400 patient bedrooms, 10 operating theatres, a morgue, classrooms, a computer center, coffee shop & dietary cafeteria, 9 diagnostic clinics, doctors clinics, emergency room trauma centre, catering facilities & standby power facilities.
 
NEW BYBLOS CITY DORMITORY BUILDINGS
New Byblos City
     Lebanon
1994 35 Mths 8.5
 
The project comprised 2 No, 6 storey buildings, each with 200 rooms totalling 18,000 sq.m., including parking and shopping centre.
 
REHABILITATION OF ROADS / ANTALIAS - AIN AALAK ROAD PROJECT
CDR
     Lebanon
1984 18 Mths 30
 
Rehabilitation of 14 kms of road including widening the exiting road from 10m to 20m, laying main sewer line, water mains, drainage system, telephone & electricity ducts. The project also included a major interchange with 3 No reinforced concrete bridges complete with sidewalks and landscaping works. Over 90,000 cu.m of concrete were placed in the reinforced concrete retaining walls and bridges.
 
ROADS - SHARJAH
Government of Sharjah
     United Arab Emirates
1978 6 Mths 0.2
 
Central & access roads to the city of Sharjah
 
MOMBASA COASTAL WATER SUPPLY PROJECT - ROADS
Ministry of Water Development
     Kenya
1977 24 Mths 1.5
 
Construction of 100 kms. of service road for the Mombasa Coastal Water Supply Project. The main project listed separately had a total value of US$ 45.00 million. The road works represented approximately US$ 1.50 million of the total and were constructed throughout the project period.
 
MESSLA OIL FIELD DEVELOPMENT PROJECT - ROADS
NKK - Japan
     Libya
1980 14 Mths 4
 
Construction of access roads between various gathering pumping stations and airstrip. Work was carried as part of the main project listed separately and valued at US$ 85.00 million.
 
REHABILITATION OF ROADS / ABOUHAILKA-DEDDE BISHMEZZINE ROAD PROJECT
CDR
     Lebanon
1984 18 Mths 20
 
The project comprised the rehabilitation of 23 kms. of road and included the laying of all underground services, telephone ducts, water mains, drainage systems, construction of retaining walls and culverts.
 
MOMBASA PETROLEUM STORAGE FACILITIES - ROADS
Lavalin (Canada) - Ministry of Energy
     Kenya
1984 26 Mths 0.75
 
Road construction works for all paved access roads & distribution roads, asphalting of earth bundwalls as part of the main project valued at US$ 14.30 million and listed separately.
 
REHABILITATION OF ROADS / JOYA - RAMEISH ROAD PROJECT
CDR
     Lebanon
1984 24 Mths 25
 
The project comprised the rehabilitation of 40 kms of road and included road widening works and extensive construction of retaining walls in mountainous terrain, laying of all underground utilities including telephone ducts and water mains.
 
FILL HAULAGE
GSLE
     Tanzania
1985 8 Mths 0.4
 
Sub contract hauling fill material for road construction project in Musoma.
 
REHABILITATION OF ROADS / SAIDA JEZZINE ROAD PROJECT
CDR
     Lebanon
1984 24 Mths 25
 
The project for the rehabilitation of 40 kms. of road included road widening and re-paving works, laying of telephone ducts and water mains, construction of reinforced concrete culverts & retaining walls in mountainous terrain.
 
MOMBASA - NAIROBI OIL PRODUCTS PIPELINE - RIGHT OF WAY
Kenya Pipeline Company
     Kenya
1985 6 Mths 0.45
 
General reinstatement works to pipeline right of way including earthworks to the road using laterite base and placing of gabions at specified locations.
 
REHABILITATION OF ROADS / FARRAYA ROAD PROJECT
CDR
     Lebanon
1984 24 Mths 10
 
Project for the rehabilitation of 10 kms. of road including road widening with road base and sub base construction, laying of main sewer, water mains, a 10 pair telephone duct bank and sidewalks. The project also included the construction of two reinforced concrete bridges.
 
REHABILITATION OF ROADS / REMEISH - BLEIDA ROAD PROJECT
CDR
     Lebanon
1984 24 Mths 12
 
Project for the rehabilitation of 18 kms. of road situated along the southern border of Lebanon. The works included re-surfacing, installation of underground telephone ducts and the construction of retaining walls and sidewalks.
 
AMSHIT ROAD PROJECT
CDR
     Lebanon
1985 18 Mths 5
 
The project for 8 kms. of new road constructed in an urban environment with high specification requirements. THe work also included sewer networks, sidewalks and other public utilities.
 
KISII - SOTIK ROAD REHABILITATION
Ministry of Transport & Communications
     Kenya
1987 10 Mths 3.5
 
The project for the rehabilitation and re-carpeting with asphalt overlay of 60 kms. of road.
 
FOREST PARK DEVELOPMENT - ALGARVE (ROADS)
Quinta da Colina Sociedade Urbanizadra (CDA)
     Portugal
1987 24 Mths 2.5
 
The project comprised the construction of roads, footpaths, reinforced concrete retaining walls, drainage systems, installation of utilities and general landscaping for the development. The complete installation of a sewage treatment plant & water tower was included in the project.
 
KISII - CHEMOSIT ROAD PROJECT
Ministry of Transport & Communications
     Kenya
1988 20 Mths 3.5
 
The project comprised the construction of 22 kms. of single asphalted carriageway and included a reinforced concrete bridge and drainage structure.
 
MOCHUDI - SIKWANE ROAD PROJECT
Ministry of Works, Transport & Communications
     Botswana
1989 15 Mths 7.5
 
The project for the construction of 41 kms. of bitumen surfaced standard 6m wide carriageway with 1.5m wide shoulders, drainage culverts and new structural steel bridge on reinforced concrete piers across the Notwane River. This project is part of the "Three Feeder Road Project" co-financed by BADEA, UNCDF and the Botswana Government.
 
PERIODIC MAINTENANCE OF THE KONGOWE TO MJIMWEMA ROAD - CONTRACT NO 7
Ministry of Works
     Tanzania
1992 10 Mths 2.2
 
The project for periodic maintenance of the road included reshaping of the road, drainage system, application of new gravel wearing course and new road furniture.
 
SIKWANE - MALOLWANE ROAD PROJECT
Ministry of Works, Transport & Communications
     Botswana
1982 7 Mths 5
 
The project comprised the construction of 15 kms. of bitumen surfaced road, standard 6m wide carriageway with 1.5m wide shoulders. The project included culverts, drainage and other associated utility works.
 
GABORONE CITY ROADS & DRAINS CONTRACT
Gaborone City Council
     Botswana
1993 12 Mths 4.3
 
THe project was part of the City Council's program to generally upgrade the City's infrastructure. THe project comprised 12 kms. of city roads, resealing works, alterations, new drainage systems, paving, widening of main roads & roundabouts, upgrading of drainage system and other associated works.
 
KANYE - RAMATLABAMA ROAD CONTRACT
Ministry of Works, Transport & Communications
     Botswana
1993 20 Mths 7
 
The project entailed the upgrading of 90 kms. of road to a double seal surface standard and included drainage, the construction of a major culvert and other associated works.
 
MWANZA & MAGOGO RIVER ROAD REHABILITATION PROJECT
Ministry of Works, Transport & Communications
     Tanzania
1994 50 Mths 30
 
The project consisted of the rehabilitation of 54 kms of road to bitumen surfaqce standard. The works included 8 No. reinforced concrete bridges ranging in length between 40m & 70m, 200 pipe & box culverts. Project extended due to additional works required by client.
 
RASESA & MONAMETSANA ROAD PROJECT
Ministry of Works, Transport & Communications
     Botswana
1994 11 Mths 4.7
 
The project for the reconstruction and widening of 25.8 kms of existing road to a double seal bituminous surface standard, including drainage & landscaping.
 
AL MINA GARDENS INFRASTRUCTURE - PHASE L TRIPOLI (ROADS)
Council for Major Projects
     Lebanon
1996 24 Mths 9.8
 
The project for 40 kms. of 12m to 32m wide bituminous roads with drainage. Carried out of part of the major project listed separately and valued at US$ 20 million.
 
DOHA - ARAMOUN INFRASTRUCTURE WORKS (ROADS)
CDR
     Lebanon
1996 30 Mths 3.96
 
The project comprised 27 kms. of road, parking facilities and 16 kms. of storm water drainage. The works were carried out as part of a major project listed separately and valued at US$ 17.90 million.
 
NEW BYBLOS CITY ROAD
New Byblos City Inc
     Lebanon
1997 31 Mths 2.5
 
Project for 3 kms. of road with all associated structural works.
 
RAINWATER RETENTION / DIVERSIONARY DAMS PROJECT
Ministere de L'Agriculture et de L'Elevage
     Senegal
2003 2 Mths 0.4
 
This environmental related project for the construction of three small dams was carried out on an emergency basis in order to prevent the repetative loss of local village habitats & food stores and the regularly ensuing distress for the village population. In addition the the water retained by the dams provides a water source to help sustain local agriculture. The basic earth fill dams with diversionary channels were constructed across naturally formed stormwater drainage channels and the project consisted of all excavation, foundation works, earth dam filling and compaction, reinforced concrete overspill channel walls and concrete bound rip rap facings. Basic works were completed in 1.5 months and now additional works in the area are being considered by the client to further improve the effectiveness of the dams and provide additional protection from the environment for the local village. Works were started mid June 2003. The initial contract works were completed and acceptance certificate issued on 24 July 2003. Additional works were carried out to enhance water retention and utilization and acceptance certificate issued on 8 October 2003.
 
KIPEVU OIL STORAGE FACILITY UPGRADE PROJECT
NKK - Kenya Pipeline Company
     Kenya
2001 24 Mths 4.35
 
The project comprised refurbishment of 3 No tanks 20,308 cu.m., 1 No tank 30,762 cu.m., 1 No tank 392 cu.m. and 2 No burried 12" dia. steel pipelines with total length of 7.5 kms. All mechanical works & testing of pipelines and tanks is completed, painting works will be completed during December. Project successfully completed in January 2004.
 
CONTRUCTION OF MORENDAT PUMPING STATION (PS 23) - NAIVASH
Kenya Pipeline Company Limited
     Kenya
2003 4 Mths 2.2
 
Project comprises preparation of site and associated civil works, site facilities including fencing, roads, drainage and water supply. Construction of Office/Control building, three workshops, store buildings, gatehouse, fire equipment store building, pipeline pump shelter, installation of two pipeline pumps, erection of firewater tank and foundations, installation of one electric, one diesel engine drive fire pumps, erection of radio mast, installation of fire water main. (Consultant : Pencol Engineering Limited)
 
OLKARIA LL GEOTHERMAL POWER PROJECT - CONTRACT OG 105 - STEAMFIELD PROJECT
Kenya Electricity Generating Company
     Kenya
2000 24 Mths 20.7
 
The project comprised 24 kms. of welded steam pipeline of various diameters ranging from 150 mm dia. to 1,050 mm dia., insulation of pipework, 13 No steel separator vessels of capacities ranging from 25 to 100 tons/hr. Section A (approximately 60% of the works) was substantially completed on 7 July 2003 and Section B will be completed December 2003. Minor works remain to be carried out, mainly reinstatement works.
 
MOSIMI ORE PIPELINE REHABILITATION PROJECT
Nigerian National Petroleum Company (NNPC)
     Nigeria
2005 12 Mths 42
 
Rehabilitation of 152 km of 12" diam fuel pipeline. The project consists the supply of 50km of steel linepipe and installation of 32km, leakage repairs, coating repairs. The project also includes pipeline integrity survey, internal cleaning, cathodic protection and replacement of valves as required.
 
MNAZI - MTWARA GAS PIPELINE
Artumas Group of Canada
     Tanzania
2006 6 Mths 6.5
 
Construction of 24kms of 6" dia pipeline, wall thickness 12mm including transport, stringing, trenching in swamps, laying of pipe, NDT, testing and commissioning. Preparation for welding and alignment of 5km of concrete surround to pipe for lauching into ocean. Project commenced mid 2006.Supply of all pipe, welding rods, construction tools, valves and fittings by others. The project engineers were Tartan Engineering Canada
 
100 MW POWER SUPPLY PLANT FOR TANESCO
Dowans Limited - UAE
     Tanzania
2007 6 Mths 4.5
 
The project comprised the construction of all foundations for 4 No TM 2500 Gas Turbine Generators and 1 No TM 6000 Gas Turbine Generator each being 20 Mw, the supply and installation of gas skids, heater skids, metering skids, air compressor, LV & 2 No HV transformers, turbine and generator removal pads, cooling tower, control room, bus bar, disconnector and required circuit breakers.Construction of concrete firewall, oil containment wall and foundations for 8 No HV overhead line pylons. Supply, construction and testing of 6", 4" & 3" pipes, valves and fittings both burried and above ground on appropriate supports. Construction of fencing, access roads, retaining walls and drainage.Project commenced January 2007.
 
TELECOMMUNICATION IMPROVEMENTS - PHASE 3
Tanzania Railway Corporation
     Tanzania
2005 10 Mths 4
 
Construction of 18 No Equipment Buildings and supports for solar power panels at 18 railway stations between Dodoma & Tabora. Including the laying of 400kms of Fibre Optic Cable from Dodoma to Tabora railway stations including preparation of right of way , excavation through all types of terrain, cable slicing, protection and backfilling and finally commissioning. Project was completed ahead of schedule.
 
18" GAS PIPELINE - AJAOKUTA TO OBAJANA
Obajana Cement PLC
     Nigeria
2004 18 Mths 12.8
 
Project for the construction of 90km of 18" Gas Pipeline, commenced February 2004. The project includes along with the pipeline pig launcher/receiver, on-line gas analysis system, pressure regulating and metering facilities, filter/scrubber, slam shut / line break valves, gas metering skid, cement factory PRF, power plant PRF, residential colony PRF, vent scrubber storage tank, fire fighting equipment & metering facility and PRF's, fire & gas detection system. Acceptance Certificate Received 21 October 2006.
 
ETHANOL BLENDING PROJECT - PHASE 1
Nigerian National Petroleum Company (NNPC)
     Nigeria
2006 6 Mths 9.5
 
The project for the modification of an existing product storage depot to allow the blending of ethanol with petroleum motor spirit agreed on 2006-01-24 comprised all modifications to existing tankage, plant pipework and control systems. Acceptance Certificate received 2 Jnuary 2007
 
REHABILITATION OF TANKS AT BONNY ISLAND TERMINAL
Shell Petroleum Development Company
     Nigeria
2001 96 Mths 89
 
Complete refurbishment of 22 No crude oil floating & fixed roof storage tanks. The tanks ranging in diameter from 33.5m to 76.3m with capacities ranging from 10,000 cu.m to 105,000 cu.m. Initial contract was US$65.00 million and additional works have been added bringing the present total contract value to US$89.00 million. It is expected that further additional works will be added in the near future. Project period extended and completed February 2007.
 
ACCRA PLAINS DEPOT EXPANSION PROJECT
Bulk Oil Storage & Transportation Company
     Ghana
2004 15 Mths 31
 
This project was taken in record time, a period of two months from pre qualification to contract award, contract being signed on 2004-07-09. Situated near to Tema it is strategic project for Ghana. This is a turnkey project including design, procurement and construction and consists of 4 No product storage tanks each of 20,000 cum, 2 fixed roof and 2 floating roof. All fire prevention and control systems including the upgrading of existing facilities. Project now 94% complete. Completion has been delayed whilst waiting for client to make decisions with regard additional requirements and operational strategy. The original project valued at US$ 20.90 million now includes additional works for US$ 1.15 million. Further works increased the project value to US$ 31.00 million when completed January 2007.
 
FATICK TO BAMBEY ROAD
Agence Travaux Routier
     Senegal
2005 12 Mths 11
 
Project comprising the construction of 40kms of new dual carriageway including all excavation, grading, sub base courses, asphalt works, drainage and associated signage.
 
PROJECT DE REAMENAGEMENT ET EXTENSION DE LA BRIGADE DE GENDARMARIE DE POPONGINE
Projet de Construction D'Immeubles Administratifs et de Rehabilitation du Patrimone Bati de L'Etat
     Senegal
2004 6 Mths 1.15
 
Project for the construction of a police base in the town of Popongine near to the Presidential retreat, comprising the construction of five new single storey buildings and the rennovation of four existing buildings.
 
SAI REPUBLIQUE BUILDING
SAI Republique
     Senegal
2006 6 Mths 1
 
Rehabilitation and extension of a nine storey office building in Dakar city center, including excavation, construction of a raft foundation, concrete structural works, demolition, masonry works, all required finishing works and associated electrical & mechanical works. New build 1400 sq.m and renovation 2800 sq.m.
 
BUIPE & BOLGATANGA DEPOTS
Bulk Oil Storage & Transportation Company (BOST)
     Ghana
2005 34 Mths 43
 
This project, the contract being signed on 2005-03-17 comprises the construction of two depots situated at Buipe in central Ghana and Bolgatanga in northern Ghana. Each depot comprises 2 No 10,000 cum fixed roof diesel storage and 1 No 10,000 cum floating roof gasoline storage tank ( a total of 6 tanks for the total project ). Additionally loading facilities were provided at each location & the projects included all associated pipework, safety systems and required earthworks & groundworks. Additional works to the value of US$ 2.19 million were added to the original project valued at US$ 23.80 million. Project value has now further increased to US$ 30.00 million with 2no additional 10,000 cum tanks one at each location. Further additional works for egineering, procurement and construction of four diesel storage tanks each of 10,000 cum, two being situated in Bolgatanga and two in Buipe was started in November 2007. These works were valued at 13 US$ Million and has an 18 month construction period.
 
UNIVERSITY OF FUTURE AFRICA
Project de Construction et de Rehabilitation du Patrimoinede L'Etat (PCRPE)
     Senegal
2001 50 Mths 20
 
This prestigious turnkey project includes the preparation of feasability study, preparation of detailed building programs, detailed design of buildings, infrastructure & landscaping, final listing of furniture & equipment requirements. The preparation of the final project cost estimate. The construction of the project commencing with the infrastructure. Involved in assisting Client in setting up funding for the project. Works were proceeding steadily until works were suspended in 2006 by the client due to lack of available funds.
 
LOT NO 2 - CONSTRUCTION & REHABILITATION OF FATICK ROAD
Project de Construction et de Rehabilitation Du Patrimoinede L'Etat (PCRPE)
     Senegal
2005 6 Mths 6.7
 
This project comprising 14 kms of mainly new construction works with only approximately 10% refurbishment works for the Fatick road of mixed single and double carriageway construction. Includes all road and associated sidewalk construction. The project is now 19% complete.
 
REHABILITATION, UPGRADING & EXPANSION OF PEPSI COLA BOTLING PLANT - MWANZA
SBC(T) Limited
     Tanzania
2005 26 Mths 4
 
Construction of the following facilities : Bottling unit, conference unit, sales and canteen block, sugar storage unit, fleet garage, utility building, cold storage hall, concrete storage tanks, and associated works including storm and waste water drains, access road, fuel storage tanks, parking area, various concrete slabs, boundary walls, structural steel works, epoxy floor treatment.
 
CONSTRUCTION OF THE LAT DIOR STADIUM - THIES
Project de Construction et de Rehabilitation Du Patrimoinede L'Etat (PCRPE)
     Senegal
2003 18 Mths 4.8
 
The Contract for this project was signed on 21 October 2003 with PCRPE and comprises procurement, construction and Commissioning of the following works: i. Rehabilitation and extension of outdoor football stadium, ii Construction of indoor basketball and atheletics track, iii Provision of electrical network and floodlighting. The beneficiary of the project carried out under the direction of PCRPE is the Ministory of Sport. Project is now delayed after it was put on hold by the client in January 2005.
 
AHS IMPORT/EXPORT CARGO WAREHOUSE
AHS Menzies (GH) Limited
     Ghana
2008 9 Mths 4
 
The EPC project comprises the detailed engineering, procurement and construction of a cargo warehouse at the Kotoka International Airport - Accra - Ghana. The warehouse some 9m high includes a mezzanine floor for offices. Included within the structure are cargo storage areas, with separate import and export facilities, offices, cold rooms, toilet facilities. The provision of and connection top all associated utilities is included in the project.
 
EXTENSION TO MAIN TERMINAL LEOPOLD SEDAR SENGHOR AIRPORT
Administration des Activities Aeoronautiques National du Senegal (ASECNA)
     Senegal
2006 15 Mths 32.14
 
This major refurbishment project for the airport comprised runway extensions and resurfacing, the provision of all required ground lighting and additional navigational aids, extensive renovation and addition of 5000 sq.m to the main terminal building including air-cooled chilled water plant and diesel power plant with associated step up/step down transformers and medium voltage transmission to the terminal building. Renovation of existing departure area facility, construction of additional parking areas with access roads, security access and lighting, service buildings for car rental agencies and banking facility, a freight hangar with associated office space. The project commenced in December 2006. The project originally planned for 6 months was extended during execution due to numerous additional requirements by the client. Zakhem was responsible for all building extensions and associated renovation works.
 
ACCRA PLAINS DEPOT EXPANSION
Bulk Oil Storage and Transportation Company (BOST)
     Ghana
2006 22 Mths 32
 
This EPC Contract comprises 4 no 10,000 cum tanks, two diesel, two gasoline, all associated control and fire protection systems, the relocation of existing carpark facilities, the tie in of the new facilities to existing facilities. The project is located aproximately 30km from Accra. Project period extended whilst additional works completed. Project was successfully completed and passed over to the Client in April 2008
 
GAS SUPPLY TO ABEOKUTA
National Nigerian Petroleum Company (NNPC)
     Nigeria
2007 12 Mths 49.6
 
Fast track EPC contract the second for Nigerian Gas Company NGC a subsidiary of NNPC. Scope comprised [1] 35kms x 24" OD class 600 gas pipeline, design capacity 250 mmscfd, from the intermediate pig launcher station on the ELP Itoki / Papalanto transmission pipeline to Abeokuta. [2] Tie in/pig launching station/facilities at the intermediate pig launcher & [3] Class 600 Abeokuta Gate Station (ACGS) at Onijaganjagan Industrial Estate and hook up to potential gas distribution facilities at Abeokuta.
 
GAS SUPPLY TO POWER PLANTS AT GEREGU - PHASE 1 & 2
Nigerian National Petroleum Company (NNPC)
     Nigeria
2006 20 Mths 220.51
 
This fast track EPC contract commencing May 2006 controlled by the Nigerian Gas Company for NNPC is in two phases. Phase 1 comprises 4.50 kms of 18" dia gas pipeline connecting the existing metering station at Ajaokuta to Phase 1 of the power plant at Gerugu (presently under construction by others) and the upgrading of the existing Ajaokuta metering station. Linepipe for this phase is provided by the Client. This phase of the project will be completed in 5 months. Phase 2 comprises 196kms of 36" dia gas pipeline from Ajaokuta to Oben where the new pipeline ties into the existing Escravos to Lagos pipeline. The works also include an intermediate pigging station and new metering station at Ajaokuta. This phase of the project will be completed in 20 months. Phase 1 was completed in 5 months.
 
RESIDENCE DE LA PAIX
Mixta Spain
     Senegal
2007 15 Mths 2.4
 
Construction in Dakar of five residential apartment blocks, one comprising ground floor plus two floors and four with ground floor plus three floors, providing totally 80 apartments.
 
SCANNERS INSTALLATION - PILING AND CIVILS WORKS
Cotecna Inspection SA
     Senegal
2009 8 Mths 1.4
 
Carried out all civils works for deep foundations for the subsequent installation of two X-Ray scanners and construction of three related administration, operations and control unit offices. The project was located in the Dakar harbour area.
 
WEST AFRICAN GAS PIPELINE PROJECT
West African Pipeline Company
     Ghana
2008 18 Mths 40
 
Completion of major project started by other contractor who failed to meet contractual obligations. The project in three countries, Benin, Togo and Ghana, In Benin the project consists 7kms of 10"dia pipeline through a major lagoon and through difficult swampy terrain with difficult access to the works and an associated metering station. For Lome there is 1.5km of 10"dia pipeline plus a metering station. In Ghana there is 1.2km of 18"dia pipeline. All three locations have associated access roads, utilities and associated control systems.
 
 
GAZODUC MED/GZ4 48" TRONCON NORD - PC4 SOUGUER TO ARZEW
Sonatrach
     Algeria
2006 20 Mths 95.41
 
EPC contract for 218kms of 48" dia and 3 kms of 32" dia Gas Pipeline. This is a major project and part of the network to supply gas from Algeria to Spain. The contract was sign on 6th February 2006.
KPONE THERMAL POWER PLANT
Ministry of Energy
     Ghana
2008 24 Mths 96.1
 
The project a 223 MW thermal plant is situated on an undeveloped costal site close to the town of Kpone near to Tema on the Gulf of Guinea. The contract for the installation, testing and commissioning of two Alstom GT11N2 (EV) Gas Turbine Generators and all associated auxilliaries plus the EPC of the power plant infrastructure. The plant will supply power to the National Grid supplementing existing hydro and thermo generation and ensure base load capacity in times of water shortage when there is inability of hydro generation to meet requirements.
PROVISION DRINKING WATER - TAMANRASSET TO SALAH
Ministry of Water Resources / E.P Algerienne des Eaux (ADE)
     Algeria
2007 36 Mths 428
 
This 428 $US million, 36 month project for water supply pipelines is in three packages, package 2 & 3 for two pipelines 800mm & 900mm dia in double trench over a distance of 382kms was awarderd to the Cosider/Zakhem/Erciyas consortium in November 2007. This is an EPC contract where Zakhem are responsible for the overall engineering design and procurement worth 43.50 US$ million.
EXPANSION OF ESCRAVOS - LAGOS GAS PIPELNE - PHASE 1
Nigerian National Petroleum Corporation
     Nigeria
2008 24 Mths 211
 
An EPC contract comprising 24ins dia x 56km swamp gas pipeline from a new Escravos tie-in & pigging station to Warri, the upgrade of the existing Warri Gas Treatment Plant and a 30ins dia x 48km land gas pipeline from Warri to Oben including a tie-in station and pigging facilities. Progress is on schedule and as of February 2010 the project was 55% complete.
EXPANSION OF ESCRAVOS - LAGOS GAS PIPELINE - PHASE 2
Nigerian National Petroleum Corporation
     Nigeria
2008 24 Mths 377
 
An EPC contract comprising 36ins Dia x 342km land gas pipeline from a new tie in and pigging station at Oben to a new tie-in and pigging station at Itoki in Lagos including three intermediate pigging stations. Engineering is well under way and procurement has started as of February 2010
KEMPINSKI ACCRA HOTEL
Gold Coast City Resorts Limited
     Ghana
2007 24 Mths 46.5
 
This EPC contract for a 249 room 5 star hotel situated on a prime site in the centre of Accra includes initial feasability studies, design/detailed engineering, procurement of all construction materials/hotel furnishings and equipment. Both detailed design and construction are now underway. Construction works include site clearance and construction of infrastructure providing all required utilities\services, construction of the 7 storey concrete framed structure including bedrooms, leasure facilities, bars, restaurents and staff facilities. The Engineering works are being executed in the USA under the supervision of Zakhem Construction.
INTEGRATED POWER GENERATION PLANT
ENI Congo Limited
     Congo
2008 27 Mths 80.5
 
The "Congo Integrated Gas Power Generation Project" is an integrated upstream\downstream project. The downstream development project comprises the complete cycle power generation with a maximum supply capacity of 450 - 480 Mw (combined cycle to be implemented in future). Zakhem Congo SARL is subcontracted to ABB Spa, Process Automation Division, Italy. The total project is for Euro 260 million (USD 182 Million) of which the subcontract is Euro 75 milion (USD 52.5 Million) with planed expansion to Euro 115 (USD 80.5 million). The works for the construction of an Open cycle Power Generation Plant consisting 2 x 160 Mw gas turbine generators includes, all civil works, electromechanical, instrumentation control , fabrication, installation, sand blasting, painting, insulation and pre commissioning of the following components: flare system, fuel gas system, diesel oil storage and distribution system, compressed air system, black start gas turbine generators, emergency power generation , closed circuit water cooling system, service, demi snd potable water systems, blow down & close drain systems, oily sewer system & chemical storage and distribution system, sanitary discharge treatment and storage system, foam / water firefighting system, all civil and structural works, all electrical and instrumentation works, precommissioning, general services, camp facilities, utilities and office services.
EMERGENCY REHABILITATION OF ATLAS COVE - MOSIMI PRODUCTS PIPELINE
Pipeline and Products Marketing Company (PPMC)
     Nigeria
2009 4 Mths 10
 
The project for PPMC a subsidiary of NNPC for the rehabilitation of72.6kms of 16" petroleum products pipeline comprised the following works; mobilisation of equipment including boats, barges and other pipeline laying equipment; the procurement of 2500m of 16" coated pipeline; cutting of 4400m of welded concrete pipe located at Akute, Imore\Ilashe, Igegun Island, including transportation to Ijeododo and Arepo\Imagbon then stringing, re-welding, including pulling and floating operations;the cutting of defective pipeline segments 7.4kms long at seven different locationsalong the ROW, installation of new sections;NDT inspection; cathodic protection; tieins; trenching \ excavation works and site reinstatement. The contract signed on 20 October 2009 started on 01 December 2009 and commissioning works are planed to start at the end of March 2010.
OML-58 UPGRADE PHASE 1 - OUR GAS PIPELINE PROJECT
TOTAL (E & P) Nigeria Limited
     Nigeria
2009 24 Mths 266
 
This EPC contract was signed on 29 January 2010 and started on 1 March 2010. The pipeline consists of 46 km. of 42" dia. pipeline between the Obite Treatment Centre and the Rumuji Node where the pipeline joins the GTS No. 4 pipeline. The pipeline includes the crossing of approximately 16 km of seasonal swamps where the pipeline is concrete coated, road, rail and river crossings. Include in the project is the complete installation of a fibre optic cable with all its necessary connections. Leak and shock detection systems, SCADA upgrading, cathodic protection, instrumentation, CCTV and lighting. The joint venture project executed jointly with Baywood Continental Limited. Zakhem will be responsible for the coordination of the engineering, project management, construction and commissioning, Baywood will carry out the engineering design, construction of temporary facilities, security and NDT systems.
EDEN ROCK
Hardstand SA
     Senegal
2008 24 Mths 15.6
 
Construction of three high standard VIP residential blocks each with 8 floors. The project located in the center of Dakar near to the beach comprised the luxurious apartment blocks plus underground parking facilities and four swimming pools. The contract was singed on 23 June 2008.