All Ongoing
All Completed
All Projects
Oil - Gas Pipelines
Tankage Works
Mechanical, Industrial
General Civil Works - Building Works
Power Generation
Road Construction
Water - Waste Water Pipelines
 
 
 
 
 
 
 
 
   
   PROJECT LISTING
 MECHANICAL, INDUSTRIAL
Type Country Client
Period Mths Year Start Date     
ONGOING PROJECTS   COMPLETED PROJECTS
 
100 MW POWER SUPPLY PLANT FOR TANESCO
Dowans Limited - UAE
     Tanzania
2007 6 Mths 4.5
 
The project comprised the construction of all foundations for 4 No TM 2500 Gas Turbine Generators and 1 No TM 6000 Gas Turbine Generator each being 20 Mw, the supply and installation of gas skids, heater skids, metering skids, air compressor, LV & 2 No HV transformers, turbine and generator removal pads, cooling tower, control room, bus bar, disconnector and required circuit breakers.Construction of concrete firewall, oil containment wall and foundations for 8 No HV overhead line pylons. Supply, construction and testing of 6", 4" & 3" pipes, valves and fittings both burried and above ground on appropriate supports. Construction of fencing, access roads, retaining walls and drainage.Project commenced January 2007.
 
ETHANOL BLENDING PROJECT - PHASE 1
Nigerian National Petroleum Company (NNPC)
     Nigeria
2006 6 Mths 9.5
 
The project for the modification of an existing product storage depot to allow the blending of ethanol with petroleum motor spirit agreed on 2006-01-24 comprised all modifications to existing tankage, plant pipework and control systems. Acceptance Certificate received 2 Jnuary 2007
 
TELECOMMUNICATION IMPROVEMENTS - PHASE 3
Tanzania Railway Corporation
     Tanzania
2005 10 Mths 4
 
Construction of 18 No Equipment Buildings and supports for solar power panels at 18 railway stations between Dodoma & Tabora. Including the laying of 400kms of Fibre Optic Cable from Dodoma to Tabora railway stations including preparation of right of way , excavation through all types of terrain, cable slicing, protection and backfilling and finally commissioning. Project was completed ahead of schedule.
 
CONTRUCTION OF MORENDAT PUMPING STATION (PS 23) - NAIVASH
Kenya Pipeline Company Limited
     Kenya
2003 4 Mths 2.2
 
Project comprises preparation of site and associated civil works, site facilities including fencing, roads, drainage and water supply. Construction of Office/Control building, three workshops, store buildings, gatehouse, fire equipment store building, pipeline pump shelter, installation of two pipeline pumps, erection of firewater tank and foundations, installation of one electric, one diesel engine drive fire pumps, erection of radio mast, installation of fire water main. (Consultant : Pencol Engineering Limited)
 
OLKARIA LL GEOTHERMAL POWER PROJECT - CONTRACT OG 105 - STEAMFIELD PROJECT
Kenya Electricity Generating Company
     Kenya
2000 24 Mths 20.7
 
The project comprised 24 kms. of welded steam pipeline of various diameters ranging from 150 mm dia. to 1,050 mm dia., insulation of pipework, 13 No steel separator vessels of capacities ranging from 25 to 100 tons/hr. Section A (approximately 60% of the works) was substantially completed on 7 July 2003 and Section B will be completed December 2003. Minor works remain to be carried out, mainly reinstatement works.
 
REHABILITATION OF ABAJI PUMPSTATION
Nigerian National Petroleum Corporation (NNPC)
     Nigeria
2000 26 Mths 12
 
The complete installation of main line pumps, drivers, compressors and blowers. In addition the project included the supply and installation of new fire water pumps, a water storage tank & other ancilliaries related to the fire fighting system, all infrastructure facilities and testing & commissioning of all pump station systems.
 
DOHA - ARAMOUN INFRASTRUCTURE WORKS
CDR
     Lebanon
1993 30 Mths 3.23
 
Project for rehabilitation of electrical & telecommunications networks. Carried out as part of a major project totalling $US 17.9 million and listed under water related projects in this listing.
 
MAINTENANCE TEL UNIT
Kenya Petroleum Refineries
     Kenya
1991 4 Mths 0.22
 
Project to clean, maintain & paint the whole TEL Unit ensuring the safe operation & reliability of the unit.
 
FURNACE REPAIRS
Kenya Petroleum Refineries
     Kenya
1991 4 Mths 0.35
 
Project for repairs to Main Crude Furnace, radiant & convection sections, including interconnecting ducting and renewal of radiant coils in the main furnace.
 
ADDITIONAL HEAD RECOVERY PROJECT
Kenya Petroleum Refineries
     Kenya
1991 6 Mths 1
 
Project for the construction of piled foundations including the installation of equipment, all ancilliary works, instrumentation & electrical works.
 
MOMBASA KPRL SHUTDOWN MAINTENANCE PROGRAM
Kenya Petroleum Refineries
     Kenya
1991 5 Mths 1.8
 
Project for the replacement of supporting beams of structures in Oil Refinery.
 
KIPEVU WHITE OILS IMPORT / EXPORT FACILITY
Kenya Pipeline Company Limited
     Kenya
1989 21 Mths 4.2
 
The project situated at the Mombasa Oil Terminal Jetty comprised the provision of a complete mechanical process system for jetty, including loading arms & manifold pipework, valves and pipework of 12" & 16" dia from jetty to existing tank farm. Complete mechanical systems for 2 No. pumping stations, epoxy lining of existing kerosene storage tank, reinforced concrete walled area & foundation for equipment, complete electrical system installation and field instrumentation, testing and commissioning of the works.
 
AIRPORT FUEL DISTRIBUTION SYSTEM - DAR ES SALAAM
British Petroleum
     Tanzania
1984 6 Mths 0.6
 
Installation of fuel hydrant - distribution system for airport at Dar Es Salaam. The project comprised the mechanical installation of all hydrants, manifold piping & plant. Additionally all associated civil works, cathodic protection, electrical & instrumentation works were included in the project. (Excluded the supply of materials)
 
TELEPHONE SYSTEM - BEIRUT
Ministry of Post & Telegraph
     Lebanon
1983 12 Mths 10
 
Rehabilitation of the telephone system of Beirut in conjunction with ITT from the USA.
 
UNITED STATES NAVY AIRFIELD - MOMBASA DEPOT
US Navy
     Kenya
1982 15 Mths 0.6
 
Construction of all facilities including offices, helicopter pad, and associated works.
 
WATER TANKS & PIPELINES
Ministry of Agriculture & Fisheries
     Sharjah
1982 3 Mths 0.2
 
Project for the construction of a 250 cu.m reinforced concrete water tank & 3 kms. of 150 mm dia. asbestos cement pipes with associated well connections.
 
PUMPS - KALBA
Ministry of Electricity & Water
     Sharjah
1982 4 Mths 0.2
 
Supply & installation of submersible pumps.
 
MODERNISATION CRUDE OIL PUMPING STATION - DAR ES SALAAM
Tazama Pipeline Company Limited
     Tanzania
1980 12 Mths 4
 
Project for the transfer, construction and total modernisation of a crude oil pumping station. (Project included civil works & supply of materials.)
 
PIPELINES DUKHAN
Qatar Petroleum Producing Agency
     Qatar
1979 8 Mths 2.4
 
Project for installation & testing of 6" dia. flowlines. Including manifold & wellhead connections.
 
DUKHAN - DOHA - UMM SAID GAS PIPE CLEANING
Department of Petroleum Affairs
     Qatar
1978 6 Mths 2.4
 
Complete cleaning & testing of gas pipeline.
 
KHUFF GAS FIELD DEVELOPMENT CONTRACT NO 6
Ministry of Finance & Petroleum Affairs
     Qatar
1976 15 Mths 4
 
Project comprised the erection, painting, testing & commissioning of well-head treatment plants. The project also included the laying of 10 kms of 6" dia. flow lines. (Excluding all civil works and supply of consumeables.)
 
HADITHIA OIL STORAGE TANKS
State Consulting Oil Products (SCOP)
     Iraq
1976 12 Mths 2.4
 
Supply, design, erection, painting, testing & commissioning. Total capacity 30,000 cu.m.
 
ELEVATED WATER TANKS - TRIPOLI
Directorate of Military Construction
     Libya
1974 12 Mths 3.6
 
Design, supply & erection of 12 No elevated water tanks, 13 No steel sheds each 12.00m x 30.00m and 3 No steel sheds each 60.00m x 100.00m
 
NGL PLANT UMM SAID
Davy Powergas Limited - Ministry of Petroleum
     Qatar
1973 6 Mths 1
 
General pipework installation in NGL plant.
 
ELEVATED WATER TANKS
Directorate of Military Construction - Tripoli
     Libya
1973 8 Mths 1.4
 
Supply and erection of elevated water storage tanks, including all civil works and piping connections.
 
RAYON PLANT - MUSSAYEB
Ministry of Industry
     Iraq
1967 8 Mths 1.5
 
Project included all mechanical installation and structural steel works including testing. (Excluding the supply of materials)
 
PETROL PUMP STATION - DOHA
Jaidah Motors & Trading Company
     Qatar
1967 6 Mths 1
 
Project included all civil works, piping works & supply of pumps.
 
DAURA GREASE PLANT
Ministry of Oil Planning & Construction Administration
     Iraq
1966 11 Mths 1.2
 
The project included all erection & testing for the 4000 ton capacity plant. (Excluding the supply of materials)